Published specificationsOperation announced

Colt Keihanna Data Centre

Seika-cho, Soraku-gun, Kyoto Prefecture

An operational hyperscale facility in Keihanna Science City. Current nominal capacity following completion of phase 2 is 45MW.

ContactOfficial websiteChecked 2026-09-23
CapacityNot verified
Rack power45MW (45.9MW in opening release)
Cooling methodN+1 water-cooled air conditioning + wall-blow air conditioning

Published specifications

it capacity
45MWCompleted site · Opening release states 45.9MW
technical area
42,000m2Facility
Cooling
N+1 water-cooled air conditioning, wall-blow air conditioning / ceiling chamber, hot aisle containment, CRAHFacility
it load per hall max
2.6MWMaximum per data hall

Differences between published sources

  • The current facility page and data sheet state 45MW, whereas the 2023 opening release stated 45.9MW. Although likely a rounding difference, values have not been converted, and the conservative 45MW figure was used for evaluation.

Notes

  • Total rack count and power per rack are not verified.
  • Basis for medium-scale or larger classification: The official facility page confirms 45MW and the official opening release confirms 45.9MW, meeting the IT capacity criteria.

Sales inquiry form for data center services

SourcesPublic sources supporting this listing