Published specificationsListed on official website
Yokohama Data Center 1
Yokohama, Kanagawa Prefecture
Listed separately for general air cooling and liquid cooling zones. Common product upper limits are not treated as whole-facility specifications.
CapacityNot verified
Rack powerNot verified
Cooling methodAir-cooled / Partial DLC zones
Published specifications
- floor load
- 1,000kg/m2Facility
- receiving voltage
- 66,000VFacility
- UPS configuration
- N+1Facility
- backup runtime
- 48hour48 hours or more
- raised floor
- 600mm500 mm in some areas
- Cooling
- Air coolingGeneral facility table. Some DLC zones are managed separately
Services and product specificationsConditions apply to each product or area and may not represent the entire facility.
Green Nexcenter
- rack power range
- min: 20 · max: 80kW/rackCommon product specifications · Not the power supply ceiling for the entirety of Yokohama 1. Provided zones and configurations require inquiry.
- Cooling
- DLCProduct
- deployment
- Deployment stated for Yokohama 1Target zones not verified
Public web inquiry form common to Nexcenter. No login required. Requires name, corporate name, contact information, request details, preferred contact method, and privacy policy agreement. No facility-specific automated quotes or instant price displays; batch AI inquiries are subject to manual follow-up after form submission. Current official name and service availability for prospective facilities must also be confirmed in the inquiry.