96MW AI-ready campus officially opened in Saitama City in April 2025. Supports up to 140kW/rack and liquid cooling.
- Rack power 140 kW
- Liquid cooling
Search public information on data centers across Japan.
Filter by location, equipment and capacity.
Showing 1–5
96MW AI-ready campus officially opened in Saitama City in April 2025. Supports up to 140kW/rack and liquid cooling.
A current commercial colocation facility of NTT East.
AGS's proprietary urban data center in Saitama-shi. New block scheduled to commence operations in 2028.
Basic facility information is listed. Check the official website for equipment specifications.
Basic facility information is listed. Check the official website for equipment specifications.
All listings use public information. Check each facility for the applicable area or product, sources and verification dates. Unverified does not mean unavailable.