An AI-ready data center planned for service delivery in 2028 in Ibaraki City, Osaka Prefecture. Phase 1 is planned for 18MW, with a 2-building total of 36MW.
Rack / cabinet capacity
Not verified
Rack power
Phase 1 IT load 18MW, 2-building plan 36MW
Cooling
N+1 wall-blow air conditioning, air-cooled modular chillers, DLC compatible
Planned · Checked 2026-09-23
NTT Global Data Centers Japan / NTT DATA · Shiroi City, Chiba Prefecture
An AI-ready data center scheduled to commence service in April 2027 in Shiroi City, Chiba Prefecture. Stated as 24MW in the official brochure and 50MW total IT capacity in the official announcement.
Rack / cabinet capacity
Not verified
Rack power
24MW for IT equipment (official brochure) / 50MW total IT capacity (official announcement)
Cooling
Wall-blow air conditioning, air-cooled centrifugal chillers, DLC compatible
Planned · Checked 2026-09-23
NTT Global Data Centers Corporation (NTT DATA Group) · Ibaraki City, Osaka Prefecture
Name, operating entity, published address, and operational status confirmed via official primary sources. Facility specifications have not been investigated.
Rack / cabinet capacity
Not verified
Rack power
Not verified
Cooling
Not verified
Planned · Checked 2026-09-24
NTT Global Data Centers Corporation (NTT DATA Group) · Shiroi City, Chiba Prefecture
Name, operating entity, published address, and operational status confirmed via official primary sources. Facility specifications have not been investigated.
Rack / cabinet capacity
Not verified
Rack power
Not verified
Cooling
Not verified
Planned · Checked 2026-09-24
NTT Global Data Centers Corporation (NTT DATA Group) · Tochigi City, Tochigi Prefecture
Name, operating entity, published address, and operational status confirmed via official primary sources. Facility specifications have not been investigated.