Osaka OSK12 Data Center
Ibaraki City, Osaka Prefecture
An AI-ready data center planned for service delivery in 2028 in Ibaraki City, Osaka Prefecture. Phase 1 is planned for 18MW, with a 2-building total of 36MW.
CapacityNot verified
Rack powerPhase 1 IT load 18MW, 2-building plan 36MW
Cooling methodN+1 wall-blow air conditioning, air-cooled modular chillers, DLC compatible
Published specifications
- it capacity
- 18MWOSK12 phase 1
- planned campus capacity
- 36MW2-building campus plan · Not a single-building value
- Cooling
- N+1 wall-blow air conditioning, air-cooled modular chillers, DLC compatibleOSK12
- service start
- 2028Phase 1 planned
Notes
- Basis for medium-scale or larger adoption: Confirmed 18MW of IT load for phase 1 on the official facility page, meeting the criteria.
NTT DATA's official public web form. A common contact point where users select 'Inquiries regarding services' and enter the data center name. No login required, but reCAPTCHA is mandatory, meaning bulk automated submissions require manual intervention or browser verification. Automated pricing is not provided.