AirTrunk OSK2
PlannedA planned hyperscale campus of up to 100MW in eastern Osaka Prefecture, intended for AI and cloud demand.
Search public information on data centers across Japan.
Filter by location, equipment and capacity.
Showing 1–12
A planned hyperscale campus of up to 100MW in eastern Osaka Prefecture, intended for AI and cloud demand.
Hyperscale facility in Nanko-Kita, Osaka City. The current official page states 19.2MW IT load and Ready for Service in May 2025.
Large-scale active colocation facility in Chuo-ku, Osaka-shi.
Current IBX in Shinmachi, Nishi Ward, Osaka City.
A colocation facility in Osaka City supporting liquid cooling through chilled-water supply to racks and cages.
Kitahama Data Center, a current mediaCONNECT colocation facility provided by NTT SmartConnect in Osaka City.
Current commercial DC in Ibaraki City. IT power 7.6 MW, available starting from 1 rack.
Large-scale colocation facility in Minoh City. 21 MW is the facility's IT power.
Opened in August 2021 in Minoh City. A base-isolated data center with 20MW and approximately 2,300 racks.
Opened in February 2023 in Minoh City. Certified as NVIDIA DGX-Ready, featuring 21MW and approximately 2,600 racks.
Nihombashi Data Center, a current mediaCONNECT colocation facility provided by NTT SmartConnect in Osaka City.
All listings use public information. Check each facility for the applicable area or product, sources and verification dates. Unverified does not mean unavailable.