Published specificationsOperation announced

Cosmosquare OS1 Data Centre

Suminoe Ward, Osaka City, Osaka Prefecture

Hyperscale facility in Nanko-Kita, Osaka City. The current official page states 19.2MW IT load and Ready for Service in May 2025.

ContactOfficial websiteChecked 2026-09-23
CapacityNot verified
Rack powerIT load 19.2MW
Cooling methodHigh-efficiency cooling (method undisclosed)

Published specifications

it capacity
19.2MWOS1 standalone facility
facility load
25MWOS1 standalone facility · Note in 2024 announcement states facility load
planned campus capacity
130MWMulti-phase campus across OS1 to OS3 · Not a single-building value
ready for service
2025-05OS1

Differences between published sources

  • Current property page states 19.2MW IT load; 2024 announcement states 25MW facility load. Both are stated side-by-side because capacity types differ, and only IT load was adopted for qualification.
  • The 2024 interim report includes phrasing that can be read as OS1 110MW, but it was not adopted as it is inconsistent with subsequent facility-specific official pages and news.

Notes

  • Joint development and operation by CloudHQ and ESR confirmed in 2025 official news.
  • Basis for medium-scale or larger adoption: Confirmed 19.2MW of IT load capacity on the current official property page, meeting the criteria.

Official inquiry page of ESR's Japan entity. Lists Japan contact email and phone number, but a dedicated data center quote form cannot be confirmed on the page, effectively starting via email/phone. No login required, no automatic price presentation. Not a CloudHQ-dedicated contact point, so the facility name must be clearly stated.