Published specificationsOperation announced
KIX12 Data Center
Minoh City, Osaka Prefecture
Opened in August 2021 in Minoh City. A base-isolated data center with 20MW and approximately 2,300 racks.
Capacity2,300 racks
Rack power20MW, approx. 2,300 racks, average 9kW/rack
Cooling methodNot verified
Published specifications
- Cabinet capacity
- 2,300rackKIX12 single building · Approximate value
- it capacity
- 20MWKIX12 single building
- average rack power
- 9kW/rackKIX12 · Average
Notes
- The cooling method cannot be identified from the officially published pages reviewed at this time.
- Basis for medium-scale or larger classification: The official facility page confirms approximately 2,300 racks and 20MW, meeting both criteria.