MC Digital Realty data centers in Japan

9 facilities in this directory. Specifications are based on public sources.

MC Digital Realty · Ibaraki City, Osaka Prefecture

KIX10 Data Center

Current commercial DC in Ibaraki City. IT power 7.6 MW, available starting from 1 rack.

Rack / cabinet capacity
Not verified
Rack power
Average 8 kW/rack
Cooling
Not verified

Operation announced · Checked 2026-09-23

MC Digital Realty · Minoh City, Osaka Prefecture

KIX11

Large-scale colocation facility in Minoh City. 21 MW is the facility's IT power.

Rack / cabinet capacity
2,600
Rack power
Average 9 kW / rack
Cooling
Not verified

Listed on official website · Checked 2026-09-19

MC Digital Realty · Minoh City, Osaka Prefecture

KIX12 Data Center

Opened in August 2021 in Minoh City. A base-isolated data center with 20MW and approximately 2,300 racks.

Rack / cabinet capacity
2,300
Rack power
20MW, approx. 2,300 racks, average 9kW/rack
Cooling
Not verified

Operation announced · Checked 2026-09-23

MC Digital Realty · Minoh City, Osaka Prefecture

KIX13 Data Center

Opened in February 2023 in Minoh City. Certified as NVIDIA DGX-Ready, featuring 21MW and approximately 2,600 racks.

Rack / cabinet capacity
2,600
Rack power
21MW, approx. 2,600 racks, average 9kW/rack
Cooling
Side-blow air conditioning

Operation announced · Checked 2026-09-23

MC Digital Realty · Mitaka City, Tokyo

Mitaka Data Center NORTH

North building of the Mitaka Data Center. IT power 7.5 MW, with integrated office space.

Rack / cabinet capacity
Not verified
Rack power
IT Power Capacity 7.5 MW
Cooling
Not verified

Operation announced · Checked 2026-09-23

MC Digital Realty, Inc. · Mitaka City, Tokyo

Mitaka Data Center South Building

Name, operating entity, published address, and operational status confirmed via official primary sources. Facility specifications have not been investigated.

Rack / cabinet capacity
Not verified
Rack power
Not verified
Cooling
Not verified

Operation announced · Checked 2026-09-24

MC Digital Realty · Inzai City, Chiba Prefecture

NRT10 Data Center

Opened in September 2021 in Inzai City. A high-density capable data center with 39MW and approximately 4,800 racks.

Rack / cabinet capacity
4,800
Rack power
39MW, approx. 4,800 racks, effective average 9kW/rack
Cooling
Side-blow air conditioning

Operation announced · Checked 2026-09-23

MC Digital Realty · Inzai City, Chiba Prefecture

NRT12 Data Center

Opened in March 2024 in Inzai City. Features 34MW and approximately 4,000 racks, offering colocation supporting air cooling and direct liquid cooling starting in January 2026.

Rack / cabinet capacity
4,000
Rack power
34MW, approx. 4,000 racks
Cooling
Air cooling and direct liquid cooling compatible

Operation announced · Checked 2026-09-23

MC Digital Realty · Inzai City, Chiba Prefecture

NRT14 Data Center

AI-ready commercial DC opening in April 2026. Up to 31 MW, hybrid liquid and air cooling.

Rack / cabinet capacity
Not verified
Rack power
Server Power Capacity Maximum 31 MW
Cooling
Hybrid Liquid and Air Cooling

Operation announced · Checked 2026-09-23