Data centers MC Digital Realty data centers in Japan 9 facilities in this directory. Specifications are based on public sources.
MC Digital Realty · Ibaraki City, Osaka Prefecture
Current commercial DC in Ibaraki City. IT power 7.6 MW, available starting from 1 rack.
Rack / cabinet capacity Not verified
Rack power Average 8 kW/rack
Cooling Not verified Operation announced · Checked 2026-09-23
MC Digital Realty · Minoh City, Osaka Prefecture
Large-scale colocation facility in Minoh City. 21 MW is the facility's IT power.
Rack / cabinet capacity 2,600
Rack power Average 9 kW / rack
Cooling Not verified Listed on official website · Checked 2026-09-19
MC Digital Realty · Minoh City, Osaka Prefecture
Opened in August 2021 in Minoh City. A base-isolated data center with 20MW and approximately 2,300 racks.
Rack / cabinet capacity 2,300
Rack power 20MW, approx. 2,300 racks, average 9kW/rack
Cooling Not verified Operation announced · Checked 2026-09-23
MC Digital Realty · Minoh City, Osaka Prefecture
Opened in February 2023 in Minoh City. Certified as NVIDIA DGX-Ready, featuring 21MW and approximately 2,600 racks.
Rack / cabinet capacity 2,600
Rack power 21MW, approx. 2,600 racks, average 9kW/rack
Cooling Side-blow air conditioning Operation announced · Checked 2026-09-23
MC Digital Realty · Mitaka City, Tokyo
North building of the Mitaka Data Center. IT power 7.5 MW, with integrated office space.
Rack / cabinet capacity Not verified
Rack power IT Power Capacity 7.5 MW
Cooling Not verified Operation announced · Checked 2026-09-23
MC Digital Realty, Inc. · Mitaka City, Tokyo
Name, operating entity, published address, and operational status confirmed via official primary sources. Facility specifications have not been investigated.
Rack / cabinet capacity Not verified
Rack power Not verified
Cooling Not verified Operation announced · Checked 2026-09-24
MC Digital Realty · Inzai City, Chiba Prefecture
Opened in September 2021 in Inzai City. A high-density capable data center with 39MW and approximately 4,800 racks.
Rack / cabinet capacity 4,800
Rack power 39MW, approx. 4,800 racks, effective average 9kW/rack
Cooling Side-blow air conditioning Operation announced · Checked 2026-09-23
MC Digital Realty · Inzai City, Chiba Prefecture
Opened in March 2024 in Inzai City. Features 34MW and approximately 4,000 racks, offering colocation supporting air cooling and direct liquid cooling starting in January 2026.
Rack / cabinet capacity 4,000
Rack power 34MW, approx. 4,000 racks
Cooling Air cooling and direct liquid cooling compatible Operation announced · Checked 2026-09-23
MC Digital Realty · Inzai City, Chiba Prefecture
AI-ready commercial DC opening in April 2026. Up to 31 MW, hybrid liquid and air cooling.
Rack / cabinet capacity Not verified
Rack power Server Power Capacity Maximum 31 MW
Cooling Hybrid Liquid and Air Cooling Operation announced · Checked 2026-09-23
About this directory Search the full directory of data centers throughout Japan. The English and Japanese directories use the same facility data.
Specifications come from public sources. “Not verified” means information has not been confirmed; it does not mean zero or unavailable. kW and kVA are kept separate. Published specifications do not guarantee current availability or acceptance of a specific configuration.
Map locations are approximate and may represent an address, municipality or prefecture. Source links may open Japanese pages.
DC Finder — Public data center information in Japan Operated by AIBRE Inc.
For operators / Free listing (Japanese)