Published specificationsOperation announced

NRT14 Data Center

Inzai City, Chiba Prefecture

AI-ready commercial DC opening in April 2026. Up to 31 MW, hybrid liquid and air cooling.

ContactOfficial websiteChecked 2026-09-23
CapacityNot verified
Rack powerServer Power Capacity Maximum 31 MW
Cooling methodHybrid Liquid and Air Cooling

Published specifications

it capacity
31MWFacility maximum
Cooling
liquid and air hybridFacility
opening
2026-04-08Facility

Notes

  • The total NRT campus capacity of 100 MW has not been transcribed as a single-building figure.
  • Basis for First Target Adoption: Verified via official MCDR announcement as building 3 on the NRT campus, opened in April 2026.

Public inquiry form, no login required. Available for business discussions and quote inquiries specifying the facility.