Published specificationsOperation announced
NRT14 Data Center
Inzai City, Chiba Prefecture
AI-ready commercial DC opening in April 2026. Up to 31 MW, hybrid liquid and air cooling.
CapacityNot verified
Rack powerServer Power Capacity Maximum 31 MW
Cooling methodHybrid Liquid and Air Cooling
Published specifications
- it capacity
- 31MWFacility maximum
- Cooling
- liquid and air hybridFacility
- opening
- 2026-04-08Facility
Notes
- The total NRT campus capacity of 100 MW has not been transcribed as a single-building figure.
- Basis for First Target Adoption: Verified via official MCDR announcement as building 3 on the NRT campus, opened in April 2026.
Public inquiry form, no login required. Available for business discussions and quote inquiries specifying the facility.
