Data centers in Japan,easier to find.

Search public information on data centers across Japan.
Filter by location, equipment and capacity.

Listed facilities
346 facilities
Published specifications
Published specifications222
Prefectures
41 prefectures

22 facilities

Showing 1–12

Illustration

JERA

千葉火力発電所の電源を活用するAIインフラ計画。電力容量最大400MW、Dell AI Factoryを計算基盤とし、2028年頃の稼働を目指す。

MC Digital Realty

Opened in March 2024 in Inzai City. Features 34MW and approximately 4,000 racks, offering colocation supporting air cooling and direct liquid cooling starting in January 2026.

  • Capacity 1,001+ racks
  • Air cooling
  • Liquid cooling
Illustration

NTT Global Data Centers Japan / NTT DATA

An AI-ready data center scheduled to commence service in April 2027 in Shiroi City, Chiba Prefecture. Stated as 24MW in the official brochure and 50MW total IT capacity in the official announcement.

  • Air cooling
  • Liquid cooling

All listings use public information. Check each facility for the applicable area or product, sources and verification dates. Unverified does not mean unavailable.