Published specificationsOperation announced

Mitaka Data Center NORTH

Mitaka City, Tokyo

North building of the Mitaka Data Center. IT power 7.5 MW, with integrated office space.

ContactOfficial websiteChecked 2026-09-23
CapacityNot verified
Rack powerIT Power Capacity 7.5 MW
Cooling methodNot verified

Published specifications

it capacity
7.5MWNorth building
building feature
Combines data center use with an office environmentNorth building

Notes

  • The 13.5 MW for the South building has not been aggregated.
  • Basis for First Target Adoption: Verified Mitaka North building as an independently operating building on the official MCDR site page.

Public inquiry form, no login required. Facilities can be specified.

SourcesPublic sources supporting this listing