Hyperscale facility opened in May 2024 in western Tokyo. Expandable to over 110 MW.
- Air cooling
Search public information on data centers across Japan.
Filter by location, equipment and capacity.
Showing 1–12
Hyperscale facility opened in May 2024 in western Tokyo. Expandable to over 110 MW.
Current flagship DC with a gross floor area of 140,000 m2.
Current commercial DC promoted as having world-class high-density facilities.
Current Tier 3-equivalent data center in Koto Ward with 5.6MW IT power.
SOUTH building operated integrally with Data Center 5. Initial 200 racks, maximum 600 racks.
Active colocation facility in Bunkyo-ku, Tokyo.
Carrier-neutral facility in Nihonbashi with 729 cabinets and 1MW.
Tier 3 facility in Shinjuku Ward with 1,615 cabinets and 3.9MW.
Facility in Nihonbashi Kobunacho opened in September 2025 with 970 cabinets and 4.8MW.
All listings use public information. Check each facility for the applicable area or product, sources and verification dates. Unverified does not mean unavailable.