Data Center 5 SOUTH

Mitaka City, Tokyo

SOUTH building operated integrally with Data Center 5. Initial 200 racks, maximum 600 racks.

ContactOfficial websiteChecked 2026-09-23
Capacity600 racks
Rack powerAverage effective 6 kVA/rack
Cooling methodHigh-efficiency cooling confirmed via official documentation.

Published specifications

status
operationalData Center 5 SOUTH
Cabinet capacity
600racksData Center 5 SOUTH
rack power
6kVA/rackData Center 5 SOUTH · Average effective 6 kVA/rack