Published specificationsOperation announced

Digital Edge TYO7

1-1 Nihonbashi Kobunacho, Chuo Ward, Tokyo

Facility in Nihonbashi Kobunacho opened in September 2025 with 970 cabinets and 4.8MW.

ContactOfficial websiteChecked 2026-09-23
Capacity970 racks
Rack power4.8MW, 5kVA/cabinet
Cooling methodAnnual PUE 1.31 (cooling method undisclosed).

Published specifications

status
operationalTYO7 · Officially opened on 2025-09-24
Cabinet capacity
970cabinetsfacility
it capacity
4.8MWfacility
Published address
1-1 Nihonbashi Kobunacho, Chuo Ward, TokyoFacility

Notes

  • Basis for final objective adoption: Opening in September 2025 confirmed via Digital Edge official facility list and official opening announcement.

Public inquiry form on the same page. No login required, consent checkbox required, no automatic pricing.

SourcesPublic sources supporting this listing