Published specificationsOperation announced
KIX13 Data Center
Minoh City, Osaka Prefecture
Opened in February 2023 in Minoh City. Certified as NVIDIA DGX-Ready, featuring 21MW and approximately 2,600 racks.
Capacity2,600 racks
Rack power21MW, approx. 2,600 racks, average 9kW/rack
Cooling methodSide-blow air conditioning
Published specifications
- Cabinet capacity
- 2,600rackKIX13 single building · Approximate value
- it capacity
- 21MWKIX13 single building
- average rack power
- 9kW/rackKIX13 · Average
- Cooling
- Side-blow air conditioningDGX-Ready specification
Notes
- The stated maximum of 150kW/rack refers to the DGX-Ready colocation specification and is not treated as a standard figure for all racks in the facility.
- Basis for medium-scale or larger classification: The official facility page confirms approximately 2,600 racks and 21MW, meeting both criteria.
Public inquiry form, no login required. For service consultation and quote requests. Separate from customer portal.
