Illustration
Published specificationsOperation announced
TY13x xScale Data Center
Inzai City, Chiba Prefecture
Operational xScale in Inzai City. Phase 1 is 8 MW, 36 MW at full operation.
CapacityNot verified
Rack powerTotal sellable capacity 36,000 kVA / 36 MW IT power at full operation
Cooling methodCooling redundancy N+20% (system undisclosed)
Published specifications
- it capacity phase 1
- 8MWPhase 1
- planned it capacity
- 36MWAt full operation
- total sellable capacity
- 36,000kVACurrent facility page · Not automatically converted to MW
- Cooling redundancy
- N+20%Facility
Notes
- Basis for medium-scale or larger adoption: Confirmed from official announcements of 36 MW IT power at full operation, meeting the criterion of 10 MW or more.
Japanese official inquiry form. Requires input and reCAPTCHA
