Illustration
Published specificationsOperation announced

TY13x xScale Data Center

Inzai City, Chiba Prefecture

Operational xScale in Inzai City. Phase 1 is 8 MW, 36 MW at full operation.

ContactOfficial websiteChecked 2026-09-23
CapacityNot verified
Rack powerTotal sellable capacity 36,000 kVA / 36 MW IT power at full operation
Cooling methodCooling redundancy N+20% (system undisclosed)

Published specifications

it capacity phase 1
8MWPhase 1
planned it capacity
36MWAt full operation
total sellable capacity
36,000kVACurrent facility page · Not automatically converted to MW
Cooling redundancy
N+20%Facility

Notes

  • Basis for medium-scale or larger adoption: Confirmed from official announcements of 36 MW IT power at full operation, meeting the criterion of 10 MW or more.

Japanese official inquiry form. Requires input and reCAPTCHA

SourcesPublic sources supporting this listing