Tokyo Fuchu Data Center

Fuchu City, Tokyo

From standard racks to products for high-load GPUs. Power and cooling methods can be verified for each product.

ContactOfficial websiteChecked 2026-09-19
Capacity4,000 racks
Rack powerHigh-load product: up to 30 kVA / rack
Cooling methodAir-cooled, rear-door water-cooled, DLC

Published specifications

Cabinet capacity
4,000rackFacility capacity scale, approximate number
receiving power
50MWMaximum power receiving capacity
standard rack height
46UStandard colocation
standard rack power
7 / 15kVA/rackBy service category
backup runtime
48hourGenerator operation using stockpiled fuel
Cooling
Wall-mounted blow air conditioning, hot aisle containment. DLC available as a separate productBy product
dlc power
150kVA/rackDLC service maximum value · The announcement for F4 is 150 kW. The unit difference is retained unresolved and not automatically converted.
dlc lead time
2monthShortest lead time · Not a guarantee of individual delivery times
remote operations
Deployment, server construction, recovery support, routine operationsOn-site operational services

Services and product specificationsConditions apply to each product or area and may not represent the entire facility.

High-load colocation

rack power standard
15kVA/rackHigh-load product, announced 2025-01-15
rack power max
30kVA/rackHigh-load product maximum value
rack height
50UHigh-load product
rack load
1,050kgHigh-load product
Cooling
Rear-door water-cooled air conditionerHigh-load product
rack count at release
100rackProvision scale as of 2025-01-15, approximate number
planned rack count
230rackFinal plan

Differences between published sources

  • Unit difference between 150 kVA on the official DLC page and 150 kW in the announcement
  • Standard 46U and DLC page 47U are managed by product

Notes

  • 2026-09-19 addendum: DC business succession on 2026-04-01 confirmed in F5.

Public web form dedicated to the data center. No login required for new inquiries; existing contractors are routed to the customer portal. Operates by entering the service, purpose, and details and awaiting a response from a representative, with no automated pricing provided. Presence of CAPTCHA at submission requires confirmation.