Illustration
Published specificationsOperation announced
Tokyo Data Center 1
Shinagawa Ward, Tokyo
Former MIND current commercial data center in the Tokyo area. Business integrated into Mitsubishi Electric Digital Innovation in 2025.
CapacityNot verified
Rack powerNot verified
Cooling methodEquipped with seismic isolation and private power generation equipment, but facility-specific method is not disclosed.
Published specifications
- status
- operationalTokyo Data Center 1
Differences between published sources
- Candidate operator name is the former corporate name. Integrated into Mitsubishi Electric Digital Innovation in April 2025.
Notes
- Rationale for inclusion in phase 2 of the catalog expansion: Facility name is listed in Mitsubishi Electric's official current data center solution catalog.
Public access pathway for solution and service inquiries. No login required, no automatic pricing. Presence of CAPTCHA after transitioning to the form was not verified.
SourcesPublic sources supporting this listing
- Source 1dl.mitsubishielectric.co.jp/dl/ldg/wink/wink_doc/contents/doc/WEB_CATA/IIP10029417A/data/target.pdfChecked 2026-09-23 (Source date Official public information retrieved as of 2026-09-23)
- Source 2www.enecho.meti.go.jp/category/saving_and_new/saiene/kaitori/dl/2025genmen_kouhyo.pdfChecked 2026-09-24 (Source date 2025)
