Mirai Ogaki Data Center 1

Ogaki, Gifu Prefecture

Facility with up to 200 racks in Ogaki. Published specifications include support for 200V.

ContactOfficial websiteChecked 2026-09-19
Capacity200 racks
Rack powerStandard 2 kVA / rack
Cooling methodUnderfloor airflow air conditioning

Published specifications

Cabinet capacity
200rackFacility maximum rack capacity · Document content as of 2024-05-30
Cooling
Underfloor airflow air conditioningEquipment for air-cooling servers
floor load
710kg/m2Facility
backup runtime
23hourContinuous operation using on-site stored fuel

Services and product specificationsConditions apply to each product or area and may not represent the entire facility.

colocation

rack height
46UFull rack
rack power standard
2kVA/rackStandard value from 2024-05-30 document · Maximum power requires inquiry. 200V compatible.
rack load
500kgUnder 500 kg; seismic load 300 kg
minimum term
1yearMinimum contract term in 2024-05-30 document
remote operations
Visual inspection, power cycling, cable patching/unpatchingRemote hands

Notes

  • PDF accessible via current website, but contents are as of 2024-05-30. Current individual contract terms are not verified.

Public web form dedicated to data centers. No login required; enter inquiry category/details, name, email, etc., with privacy policy agreement required. No automated price quotes provided.

SourcesPublic sources supporting this listing