Commercial IDC in Ogaki opened in 2009. According to 2020 official materials, Ogaki IDC has 100 racks.
- Capacity ≤300 racks
- Air cooling
Search public information on data centers across Japan.
Filter by location, equipment and capacity.
Showing 1–5
Commercial IDC in Ogaki opened in 2009. According to 2020 official materials, Ogaki IDC has 100 racks.
Facility with up to 200 racks in Ogaki. Published specifications include support for 200V.
Facility with up to 300 racks. Discrepancies exist in official documentation for power and cooling; conditions must be verified.
Basic facility information is listed. Check the official website for equipment specifications.
Basic facility information is listed. Check the official website for equipment specifications.
All listings use public information. Check each facility for the applicable area or product, sources and verification dates. Unverified does not mean unavailable.