Illustration
Published specificationsOperation announced
Osaka Data Center 2
Osaka Prefecture
NRI's commercial data center in the Osaka area. Building 2 began operation in 2022.
CapacityNot verified
Rack powerPower receiving capacity: 7,500 kVA (former official business overview)
Cooling methodAir conditioning details could not be verified from public information.
Published specifications
- status
- operationalOsaka Data Center 2
- it capacity
- 7.5MWOsaka Data Center 2
Notes
- Primary target inclusion rationale: Confirmed as an active facility with Building 2 operational via official NRI materials.
Public inquiry contact. Topic-selection based, no login required, not facility-dedicated.
