Illustration
Published specificationsPlanned

Osaka Sakai AI Data Center Initiative

Sakai City, Osaka Prefecture

AI data center project in Sakai, Osaka. Operational timing and power capacity are listed as planned values.

ContactOfficial websiteChecked 2026-09-19
CapacityNot verified
Rack powerNot verified
Cooling methodNot verified

Published specifications

target operation
Fiscal year 2027Target stated in fiscal year 2026 KPI
planned receiving power
140MWPower receiving capacity assumed necessary for an AI computing platform of 110 exaFLOPS
compute plan
110exaFLOPSConcept, precision conditions not obtained

Differences between published sources

  • The 2024 announcement stated during 2026, approximately 150 MW, and over 250 MW in the future. Separate the definition and point in time from the currently published target.

Notes

  • A separate project from KDDI Osaka Sakai. Current contractable capacity is unknown.

Public web form dedicated to the data center. Quote requests can be selected without requiring a login. Operates by entering company name, contact person, telephone number, email address, etc., and awaiting a response from a representative, with no automated pricing provided. Presence of CAPTCHA requires confirmation at submission.

SourcesPublic sources supporting this listing